“Techno Metal Post has revolutionized deck building for me.The ability to set the steel piles and build in the same day greatly increases production. Add to the fact that I’m saving huge bucks in labour by not having to remove displaced earth, haul concrete, and clean up the mess, this makes Techno Metal Post the only way to begin a deck project” – Paul Lafrance (Disaster Decks and Decked Out on HGTV)
Recognizing the application and use of these steel metal posts, Techno Metal Post’s helical pile is screwed into the ground using proprietary machinery until the bearing capacity required for your structure is achieved.
High Quality
Techno Metal Post team is committed to purchasing North American steel for manufacturing its pile
Proven Technology
Certified and recognized by industry authorities in many countries, construction professionals, and customers worldwide.
Certified
Techno metal post is the first company in the screw pile industry to have obtained certifications in canada and the u.s., as well as a technical assessment in europe.
Environmentally Friendly
Installation processes are environmentally friendly, ensuring flora and fauna remain protected and wildlife habitats and ecosystems are preserved.
Benefits
- Rapid installation
- Ready to build on immediately
- No excavation
- No concrete required
- Removable
- Minimal environmental impact
- Low footprint on the job site
- Immediate load carrying capability
- Installation at remote locations or at sites with limited access
- Installation monitoring and verification of load capacity during installation
- Installation in high groundwater conditions
- Wide range of soil and load applications
- Installation produces minimal vibrations and ground disturbance
- Tight Access
- Proprietary equipment that allows installation of helical piles indoors due to our equipment having an electric motor option